August 1, 2012
Works on conveyors installation in assembly shop and paint shop of “HMMR”

During two weeks of 2012 summer shutdown at Hyundai manufacturing there were executed works on design, manufacturing and installation of metals structures for conveyors in assembly and paint shops.