– Installation of 4 paint robots of Sames company was executed at “Renault Avtoframos”

During 2012 summer shutdown installation of 4 paint robots of Sames company was executed, including connection to production lines, Renault Avtoframos.

– Contract on arrangement of new system of body wash at “Nissan” was concluded

In July 2012 contract on arrangement of new system of body wash was concluded with Nissan manufacturing.

– Contract on service of all air supply ducts was concluded with “Nissan”

In July 2012 contract on service of all air supply ducts was concluded with Nissan, including schemes compilation, duct condition investigation and issuing conclusions of exploitation term.

– At own production site 2 tanks of 30 cubic meters capacity were manufactured

In July 2012 at own production site 2 tanks of 30 cubic meters capacity were manufactured, they are for production liquids used in technological processes.

– Works on carry-over of gas supply ducts at “Nissan” were carried out

During summer shutdown at Nissan manufacturing works on carry-over of gas supply ducts, modification of wax application station and arrangement of  leakages collection system was concluded.